• Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
  • Golden Spike Railroad
Note: 10 Photos in slideshow. Phase #1 & #2 included 314 total man hours of labor.

Golden Spike Railroad

Railroad Track Plan:
Golden Spike Railroad
Railroad Requirements:
  • Layout Size 3' x 8'
  • D.C. Dual MRC Control System
  • Atlas Code 80 Track
  • All Turnouts are Manual
  • Desert Scenery
  • 2 Loops on 2 Levels
  • Details are 1880's Time Period
  • All Structures have Lighting
 

This client wanted a small portable layout for him take on a Golden Spike tour. Featuring the Golden Spike ceremony at Promontory Point. Note: The railroad splits in half for easy traveling..




[ Return to N Scale Railroad Index ]