Note: 10 Photos in slideshow. Phase #2 only included 1,262 total man hours of labor.
Grampa's Railroad
This client wanted to operate Lionel trains with grandchildren.
Railroad Requirements:
- Layout Size 12' x 24'
- Lionel Analog System.
- Gargraves Track
- All turnouts are Lionel
- Summer Scenery
- Many operating accessories
- All structures have lighting
- 5 loops on 3 levels, bottom level is a subway line.
[ Return to O Scale Railroad Index ]