Note: 10 Photos in slideshow.
Phase #1 man hours 120.75 & Phase #2 man hours 127.25
248 total man hours of labor.
Classic 5'x12' Railroad
Railroad Track Plan:
This client wanted a small double track railroad, featuring 2-3 trains operation, with fall season scenery and details.
Railroad Requirements:
- Size 5' x 12'
- MRC Prodigy WiFi DCC System
- Control Shelf
- Electronic Wiring
- Code 83 Atlas Track
- Double track
- Remote turnouts
- Gray ballast
- Farm and a pond
- Small Town Main St.
- Structure Lighting
- A Mountain
Classic 5'x12' Railroad video
[ Return to HO Scale Railroad Index ]